Lat 25⁰ 0.795’N Lon 055⁰ 05.404’E



980true dots bottomright 250true true 800http://www.emarine.ae/en/wp-content/plugins/thethe-image-slider/style/skins/frame-black
  • 5000 random true 60 bottom 30
    Slide1
  • 5000 random true 60 bottom 30
    Slide2
  • 5000 random true 60 bottom 30
    Slide3
  • 5000 random true 60 bottom 30
    Slide5

CS Maram (DP II)

CSM2

 

Name of vessel Cableship Maram
Place / Year of Built Abu Dhabi / 2016
Co Country of Registration and Flag UAE
Call Sign A6E2486
Official Number 7208
IMO Number 9692442
Gross Tonnage 8179 tons
Net Tonnage 2453 tons
Dead Weight 4920 tons
Vessel Type Cable laying Ship, Stern Installation. Bow Maintenance, Unrestricted Navigation
Class RINA- Green plus
Class Notation Star Hull, AUT-UMS, AUT-Port (Malta Cross), Dynapos AM/AT R DP-2, Inwater Survey, MLC Design, Green Plus, LowSOx(N)0.1%

 

 

 

 

MAIN PARTICULARS

Length Overall 126.37 m
Breadth Moulded 16.6 m
Depth Moulded 8.10 m
Drought (fully loaded) 6.15 m
Dead Weight 4923  tons
Load capacity 2750  tons
Speed 15.0 knots
Endurance 60 days
Cable Management System Winfrog integrated cable management system interfaced to the LCE, DGPS, gyro, echo sounder and DP
Handling Equipment 1 Aft Crane SWL 20 t @ 10 m -  5 t @ 23m
1 Forward Crane SWL 5 t @ 14.5 m
2 Provision Cranes: 1.5 t @ 6.0 m 
A –Frame  35 tons SWL ( future installation)

 

ACCOMMODATION

Total Cabins 51
Single Cabins 25
Double Cabins 21
VIP Cabins 5
Capacity 72 persons

 

MAIN CABLE HANDLING FACILITIES

 Cable Tanks 3 Cable tanks of 700 m3  each
Total load capacity : 2700 mt
Repeater stacks : 3 x 32 Repeaters fitted with independent AC control system
 Jointing Room 1 Jointing room fully equipped. PGU OCTL system capable of performing repair between 2 active BU’s
Testing Room PFE Spellman UK 12KV /2Amps – Fully equipped.

 

 

 

MACHINERY

Main engine Power 4 MAN Diesel Engines x 3024 kW each
Harbor Generator 2 MAN x 865 KW
Emergency Generator 1 MAN x 250 KW
Total Output 2 x 2750 kW
Aft Main Propulsion 2 X 2750 KW  Berg Azimuth Thrusters (CPP)    3 meters Dia, Berg Pitch Control Propellers
Bow Thrusters   3 x 1500 KW,  2.25 m  Dia,  Berg Pitch Control Propellers
Bollard Pull   90 Tons

 

CABLE MACHINERY

Linear Cable Engine (LCE) Parkburn 18 Wheel Pair ,  18 tons , Electrically driven LCE
Cable Drum Engines  (CDE)  2 Cable Drum 4 m Diam. 40 tons, Electrically driven.
Draw Off Hold Back (DOHB) 2 Draw Off Hold Back of 4 wheel Pairs 4 Tons, electrically driven.
Plough ( future installation) MD 3 upgraded, 1500 m water depth , 1.5 m burial depth

 

NAVIGATION BRIDGE & COMMUNICATIONS EQUIPMENT

Dynamic Positioning System Marine Technology
Auxiliary control station 1 Main Console + 3 Secondary (BERG)
Reference Systems for DP System 3 x Gyro, 2 x DGPS, Wind Sensor, MRU, USBL, CYSCAN
Navigation aids (model and type) MT Integrated Bridge System
Magnetic Compass 1 x Lilley & Gillie (MK-2000)
Gyro compass 3 (Navigat X MK1)
Autopilot 1 (Marine Technology)
Echo sounder Skipper 1 x (50KHz TGM 60-50-25L) + 1 x (200KHz NGM 100-200-25L)
Navtex 1 x (MCMURDO Smart find GMDSS) /1 (Thermal Printer  DPU 414)
Log 1 x Skipper Speed Log  (DL-850)
Radar 1 x X-Band (Sperry Marine) + 1x S-Band (Sperry Marine)
GPS receivers 1 x (GPS Navigator JLR-7600)
Satellite Communications System with email facilities INMARSAT, VSAT Seatel 4012, FBB Sailor 500
Fixed and Hand Held VHF Radios & Frequency 2 x Sailor 6222 VHF DSC / 3 x VHF Radios (ENTEL / HT649-JH05665) (156 to 163.275 MHz)

 

FLUID TANK CAPACITIES

MGO (incl. settling and service tank) 1623 tons
Ballast water 2394 tons
Fresh Water 350 tons
Fresh Water Makers  2 Nos. 20 t day each 1 R.O & 1 Vacuum type 
Drinking Water 12 tons
Lubricating oil 57 tons
Miscellaneous tanks 40 tons

 

ROV

Make SMD, U.K / QT 400
Type: Work Class / Trencher
Operational Depth: 2500m
Burial Depth Up-to 1.5 m (Depends on sea-bed conditions.)