As-Laid inspection survey utilizing ROV
Cable Management Control Room
Cable being coiled in Ships cable tanks prior to laying
Cable being guided to the Platform
Damaged Cable hauled on board
Damaged Cable recovery
Deployment of Polyspace Pipeline crossing
Electric Linear Cable Engine
Fully Automated LCE Control with automatic Slack Control via WinFrogTM CMS
Jointing preparations
Polyurethane Riser as installed
Preparation of Pipeline crossing using Polyspace
Preparation of Polyurethane Riser
Repeater Launching
Shore End Trenching
Shore End landing of Cable
Shore End landing of Cable_2
Shore end trench prepared
Small cable landing craft (pontoon) for shore end works
Workboats