E-marine

Image Gallery

As-Laid inspection survey utilizing ROV

As-Laid inspection survey utilizing ROV

Cable Management Control Room

Cable Management Control Room

Cable being coiled in Ships cable tanks prior to laying

Cable being coiled in Ships cable tanks prior to laying

Cable being guided to the Platform

Cable being guided to the Platform

Damaged Cable hauled on board

Damaged Cable hauled on board

Damaged Cable recovery

Damaged Cable recovery

Deployment of Polyspace Pipeline crossing

Deployment of Polyspace Pipeline crossing

Electric Linear Cable Engine

Electric Linear Cable Engine

Fully Automated LCE Control with automatic Slack Control via WinFrogTM CMS

Fully Automated LCE Control with automatic Slack Control via WinFrogTM CMS

Jointing preparations

Jointing preparations

Polyurethane Riser as installed

Polyurethane Riser as installed

Preparation of Pipeline crossing using Polyspace

Preparation of Pipeline crossing using Polyspace

Preparation of Polyurethane Riser

Preparation of Polyurethane Riser

Repeater Launching

Repeater Launching

Shore End Trenching

Shore End Trenching

Shore End landing of Cable

Shore End landing of Cable

Shore End landing of Cable_2

Shore End landing of Cable_2

Shore end trench prepared

Shore end trench prepared

Small cable landing craft (pontoon) for shore end works

Small cable landing craft (pontoon) for shore end works

Workboats

Workboats

News
E-marine expands its Salalah Storage Facility to match the rising customer demand.
SEACOM Selects E-Marine as Maintenance Solutions Provider
E-marine Cable Ship Completes First Phase in TEAMS Cable Deployment
Purchaser
E-Marine Establishes Cable Depot at Port Of Salalah, Oman
[Read All News]

Gallery